martes, 29 de septiembre de 2026
BuscarExplore
Source trace. Via News points to the documents behind its reporting and shows what we drew from each — so you can check any claim. How we source
Source document· January 16, 2026

Park Aerospace (PKE) Q3 2026 Earnings Transcript

View original at nasdaq.com
Park Aerospace (PKE) Q3 2026 Earnings Transcript Image source: The Motley Fool. DATE Tuesday, January 13, 2026 at five p.m. ET CALL PARTICIPANTS Executive Chairman — Brian ShorePresident and Chief Operating Officer — Mark A…
Opening lines of the source · short snapshot — read the full document at the original

Lo que extrajimos de esta fuente

The claims Via News extracted from this document. We point to the source; we don't replace it.

  • Q3 missed shipments of $740K due to international freight, supply chain, and spec/engineering issues

    80% confidence
  • Q4 GE Aerospace program sales forecast of $7.25M-$8.25M

    80% confidence
  • Middle River Aerostructure Systems informed of nacelle demand significantly more than 7,900 units

    80% confidence
  • Target of ~$200M annual composite materials sales by end of FY2031 based only on known programs, known customers, known sales with no 'other' category

    80% confidence
  • Park recently asked to increase expected output by significant orders of magnitude for missile programs

    80% confidence
  • Minimal tariff impact in Q3 as Park prices materials on short-term basis and passes tariffs on to customers

    80% confidence
  • Capital spend timing: ~60% in FY2027, ~30% in FY2028, ~10% in FY2029

    80% confidence
  • Park has paid dividends for 41 consecutive years totaling $29.72 per share since 2005

    80% confidence
  • New facility completion targeted for second half of calendar 2027

    80% confidence
  • Maximum theoretical post-expansion capacity of ~$315M-$320M annually under mill operation (6 days/24 hours, not desired)

    80% confidence
  • New facility operational (producing/selling qualified product) targeted for second half of calendar 2028

    80% confidence
  • Boeing CEO cited increased FAA scrutiny post-737 MAX issues as factor in 777X delays

    80% confidence
  • COMAC C919 expected to fall short of 2025 delivery target due to supply chain and international trade issues

    80% confidence
  • Airbus delivered 97 aircraft in December 2025

    80% confidence
  • New $50M manufacturing facility will double existing composite materials manufacturing capacity

    80% confidence
  • Multiple confidential missile programs represent very significant revenue opportunities over long periods but too confidential or sensitive to identify at this time

    80% confidence
  • Park committed €50K (50/50 split) for joint economic study with Arian for potential major C2B fabric manufacturing facility in U.S., expense expected in Q4

    80% confidence
  • Park is sole source qualified for specialty ablative materials on PAC-3 missile system program

    80% confidence
  • Airbus A320neo family has 4,275 delivered through November 2025, backlog of 7,900+ aircraft, total 12,000+ aircraft

    80% confidence
  • Airbus targeting 75 aircraft per month delivery rate in 2027, 50% increase from current ~51/month

    80% confidence
  • Boeing 777X has 600+ orders with FAA certification/EIS/first delivery now expected in 2027, in Phase 3 of certification testing

    80% confidence
  • We think Trump administration defense policy is great, wonderful. Park already building factory without incentives/encouragement.

    80% confidence
  • Q4 FY2026 EBITDA guidance of $4.75M-$5.25M

    80% confidence
  • CFM significantly ramped up production deliveries

    80% confidence
  • COMAC C909 has 75+ delivered, operating in 10-12 Asian countries, carried 30M+ passengers, 385 open orders, at production rate

    80% confidence
  • Park produced 18 proprietary sigma struts for James Webb Space Telescope orbiting ~1 million miles from Earth

    80% confidence
  • Full year FY2026 sales forecast of $72.5M-$73.5M including ~$9.8M C2B fabric sales

    80% confidence
  • Full year GE Aerospace program sales forecast of $29M-$29.5M

    80% confidence
  • Park has authorization to repurchase 1.5M shares, has executed 718,000 shares at $12.94 average, with no purchases in Q2, Q3, or Q4 to date

    80% confidence
  • Lockheed Martin PAC-3 production capacity expanded from 375 units (2 years ago) to 600 (current) with target of 2,000 units annually, 60% increase in last 2 years alone

    80% confidence
Lo que sabemos · la inteligencia detrás de esta página
En vivo desde el sustrato
Lo que estamos viendo
The Agentic Takeover of the CFO's Office
Enterprise finance software vendors—BlackLine, OneStream, Numero AI, and Oracle—are racing to embed autonomous AI agents into core financial operations (close, consolidation, reporting), backed by consolidation M&A (Numero-Royu, BlackLine-WiseLayer), fresh leadership hires, and survey data showing nearly a quarter of CFOs plan to boost AI spending over 50%. Adoption momentum is strong even as at least one bellwether (Oracle) sees its stock lag year-to-date, suggesting the market hasn't yet fully priced in the shift from AI-as-feature to AI-as-agent in finance.
Nuestra lectura de los datos ›
Señales que seguimos
Satellite-Terrestrial Network Integration Acceleration
Increased investment and launches in hybrid satellite-cellular networks across telecom industry; competitive responses from other carriers; regulatory activity around satellite spectrum; expansion of emergency/rural connectivity use cases
Patrones que observamos ›
Donde las fuentes discrepan
Morgan Stanley & Co. LLC
Two significantly different EPS values (10.21 vs 2.68 USD_per_share) are reported for Morgan Stanley on the same observation date (2025-12-31). Fact A specifies FY 2025, while Fact B's 'N/A' fiscal period is ambiguous. If both represent FY 2025 annual EPS, these values directly conflict. The magnitude of the difference (3.8x) is too large to attribute to rounding or minor calculation variations. The missing fiscal period in Fact B raises data quality concerns, but same-date observation + same attribute should reference the same period.
Señalamos los conflictos abiertamente ›
Verificado recientemente
✓ Verificado con la fuente original
4,984
hechos rastreados a su fuente — y señalamos los que no se sostienen.
101 entidades seguidas4,984 hechos verificados con la fuente5,314 documentos fuente archivados
Consulta estos datos → isubstrate.com
Park Aerospace (PKE) Q3 2026 Earnings Transcript — Source | Via News | es.VIA.NEWS